Haha, I love they want the development to be EV ready, but don't have specific requirement. It is a good idea though. I've looked into prepping for EV charging stations in the past, and this is what I came up with.
- Conduit in the ground with pull strings
- Concrete base and a conduit stub up for the Leviton EVPED-2 charging pedestal located so that one pedestal can serve two spots.
- 40A 2 pole breakers in the panelboard marked for future EV stations (breakers are cheaper when ordered with the panel and physically reserving the space never hurts.)
- Electric service (utility transformer) sized for future load.
Haha, I love they want the development to be EV ready, but don't have specific requirement. It is a good idea though. I've looked into prepping for EV charging stations in the past, and this is what I came up with.
- Conduit in the ground with pull strings
- Concrete base and a conduit stub up for the Leviton EVPED-2 charging pedestal located so that one pedestal can serve two spots.
- 40A 2 pole breakers in the panelboard marked for future EV stations (breakers are cheaper when ordered with the panel and physically reserving the space never hurts.)
- Electric service (utility transformer) sized for future load.
- Panelboard amps sized for future load.